Fevi-gloo is designed to fully contain dust and abrasive residues, preventing dispersion into the environment and drastically reducing risks for the operator, equipment, and surrounding area.
As standard, Fevi-gloo includes a powerful single-phase wheeled dust collector with an integrated filter, already prearranged for connection to the structure. The unit ensures continuous extraction of 14 m³/min of contaminated air, keeping the internal environment clean and safe.
The external and internal surfaces of the sandblasting chamber are made of high-performance PVC fabrics, with reinforced anti-wear, fire-retardant walls, durable over time even under intensive stress.
The standard version of the sandblasting chamber has an internal area of 2.5 m x 2.0 m x 2.20 m H (customizable)
FEVI - GLOO available configurations:
360° Benefits
1. For the operator
- Protected environment: reduced exposure to dust and abrasive residues
- Improved ergonomics: large front opening and internal height allowing free movements
- Weather protection and more stable micro-climate
- Reduced perceived noise during sandblasting
Mandatory use of personal protective equipment
2. Operability
- Quick installation without masonry work
- Versatile use: workshop, construction site, trade fairs, industry, building
- Extreme portability: a single operator can transport it on a pallet jack or in a hard case
- Compatible with open-blast sandblasters, recovery systems, and dust collectors ≥ 14 m³/min
3. For the environment
- Drastic reduction of dust dispersion into the environment
- Perfect for green abrasives and dry processes
- Reduces the need for water washing and resulting wastewater
4. For space
- Almost zero footprint when stored; ideal for warehouses or vans
- Adaptable to limited and irregular spaces
- Installable and removable without leaving traces in temporary areas
- Installs in less than 20 minutes with a standard blower; at the end of the job it deflates, rolls up, and can be carried in a bag or dedicated flight case
Assembly, Disassembly and Storage
The preparation and assembly time of FEVI-GLOO is about 20 minutes with the help of 1 trained operator.
The sandblasting chamber weighs about 45 kg and once stored in its transport and storage bag, it occupies a volume of approximately 80 x 80 x 80 cm.
Why choose a portable sandblasting chamber
Critical issues of outdoor sandblasting | Solution with FEVI-GLOO |
---|---|
Dispersion of fine dust and silica → penalties (Legislative Decree 152/06) | Closed and extracted environment: no external emissions |
Ban on free crystalline silica → penalties (Legislative Decree 81/08, art. 224–233) | Containment + possibility of using alternative abrasives |
Expensive masonry works for fixed chambers | Mobile structure without building permits; quick assembly |
Complex authorization procedures (AUA) | Often does not require AUA thanks to the closed system; only check with local authority |
FEVI-Gloo is the sandblasting chamber that revolutionizes the industry: portable, inflatable, and zero-impact.
Want to know more about FEVI-GLOO sandblasting chambers? Fill out the form below and we will reply as soon as possible